logo
상품
news details
> 뉴스 >
Long Lead Time? — Six H/L Fin Tube Lines Guarantee Fast Delivery
행사
문의하기
Ms. Jennifer
86-510-86182526
지금 연락하세요

Long Lead Time? — Six H/L Fin Tube Lines Guarantee Fast Delivery

2025-06-02
Latest company news about Long Lead Time? — Six H/L Fin Tube Lines Guarantee Fast Delivery

Fast project turnaround is critical for EPC contractors, boiler manufacturers, and heat exchanger integrators. Zhongyue Metallurgy meets this demand through its six fully automated production lines for H-Type and L-Type finned tubes, achieving a daily capacity of 20 tons and monthly production exceeding 600 tons.

The facility can produce tube diameters from 25mm to 73mm and lengths up to 18 meters, covering multiple fin configurations — including H-type, perforated L-type, and wheel-type L fins. Advanced feeding, welding, and straightening systems guarantee consistent weld seams and high dimensional accuracy, reducing custom production time by more than 30%.

Each tube undergoes hydrostatic and air pressure testing to ensure structural integrity. The exterior is coated with zinc phosphate primer, and the interior is protected by VCI anti-corrosion treatment, ensuring rust-free delivery even after long-distance transport or storage.

Whether used in boiler economizers, waste heat recovery systems, or marine energy applications, Zhongyue can complete design, production, and shipment within 2–3 weeks, enabling customers to meet tight construction deadlines.

With a combination of high-efficiency manufacturing, strict quality control, and flexible customization, Zhongyue Metallurgy has become a trusted global supplier of finned tubes, delivering fast, reliable, and application-specific heat transfer solutions to industries worldwide.

상품
news details
Long Lead Time? — Six H/L Fin Tube Lines Guarantee Fast Delivery
2025-06-02
Latest company news about Long Lead Time? — Six H/L Fin Tube Lines Guarantee Fast Delivery

Fast project turnaround is critical for EPC contractors, boiler manufacturers, and heat exchanger integrators. Zhongyue Metallurgy meets this demand through its six fully automated production lines for H-Type and L-Type finned tubes, achieving a daily capacity of 20 tons and monthly production exceeding 600 tons.

The facility can produce tube diameters from 25mm to 73mm and lengths up to 18 meters, covering multiple fin configurations — including H-type, perforated L-type, and wheel-type L fins. Advanced feeding, welding, and straightening systems guarantee consistent weld seams and high dimensional accuracy, reducing custom production time by more than 30%.

Each tube undergoes hydrostatic and air pressure testing to ensure structural integrity. The exterior is coated with zinc phosphate primer, and the interior is protected by VCI anti-corrosion treatment, ensuring rust-free delivery even after long-distance transport or storage.

Whether used in boiler economizers, waste heat recovery systems, or marine energy applications, Zhongyue can complete design, production, and shipment within 2–3 weeks, enabling customers to meet tight construction deadlines.

With a combination of high-efficiency manufacturing, strict quality control, and flexible customization, Zhongyue Metallurgy has become a trusted global supplier of finned tubes, delivering fast, reliable, and application-specific heat transfer solutions to industries worldwide.

사이트맵 |  개인정보 보호 정책 | 중국 좋은 품질 열교환기 탄미익 관 공급업체. 저작권 © 2015-2025 JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD 모두 모든 권리 보호